1915 Indian V-Twin1 / 15 Flyer as advertised at Oley, Pennsylvania.2 / 15 The project as it arrived at our shop.3 / 15 The engine cases had to be painted prior to assembly.4 / 15 The rebuilt engine mostly assembled.5 / 15 Rear swing arm missing the swing arm shaft.6 / 15 Pat, Walter, and Dick (L to R) assembling the frame and forks.7 / 15 Rear swing arm attached with the swing arm shaft pin.8 / 15 Left side leaf springs and complete rear swing arm assembly attached.9 / 15 Right side leaf springs and complete rear swing arm assembly attached.10 / 15 Front forks and front leaf spring assembly attached with front fender tip.11 / 15 The transmission was found completely disassembled. Each part was located and painstakingly fitted to the transmission case.12 / 15 New paint was applied to the completely assembled transmission.13 / 15 Transmission and oil canister fitted to the frame.14 / 15 Newly painted gas tank is fitted to the frame15 / 15